Screeding Works for Starbucks – Leeds
Interior Screed Group Ltd was appointed to carry out specialist screeding works for a new Starbucks outlet in Leeds. The works required a fast-track solution to align with the tight construction programme and ensure a durable surface capable of handling heavy daily footfall.
To achieve this, our team installed a ready-mixed rapid-drying screed, delivering strength, consistency, and a high-quality finish within accelerated timeframes.
Scope of Work
- Supply and installation of ready-mixed rapid screed.
- Full site preparation to ensure adhesion and performance.
- Installation to precise levels, creating a durable base for high-traffic commercial finishes.
- Delivered to a fast-track construction programme to meet the client’s opening deadline.
Challenges
- Programme pressure: Starbucks required a rapid turnaround to support fit-out and opening schedules.
- Durability requirements: The screed needed to perform under continuous high foot traffic.
- Quality finish: A precise, smooth surface was essential to receive final floor coverings.
Our Solution
- Installed ready-mixed rapid-drying screed, ensuring reduced curing times and accelerated readiness for follow-on trades.
- Delivered a precision-level finish across all screeded areas.
- Coordinated with main contractors to complete works efficiently within the required timeframe.
Results
✅ Completed on time and on programme.
✅ Delivered a high-performance screed suitable for heavy commercial use.
✅ Enabled early access for shopfitting and fit-out works.
✅ Provided a durable, level surface ready for Starbucks operations.
Project Value
This project demonstrates Interior Screed Group Ltd’s ability to deliver fast-track commercial screeding solutions without compromising on quality. By installing ready-mixed rapid screed, we supported the successful and timely opening of a flagship Starbucks store in Leeds.