Inspection Before screeding work is commenced, the base should be checked for level to ensure that the specified thicknesses of screed can be applied over the whole area.
This is essential for precast concrete units as some planks can have appreciable camber. The work should be inspected during progress and after completion, attention being paid to the following points:
- a) materials;
- b) preparation of the base, where the levelling screed is to be bonded;
- c) batching and mixing;
- d) proper compaction;
- e) correct finishing;
- f) levels and surface regularity;
- g) correct curing.