Client: 105-111 Micklegate Boutique Aparthotel
900m2+ of floor screeding completed into a new Aparthotel in one of Yorks most architecturally rewarding streets. Interior Screed Group worked in collaboration with our client to deliver the screeds into this logistically challenging building site. Close to York City Walls and Micklegate Bar we specified a suitable screeding method to overcome access restrictions.
Scope of Work
- Floor Area: 900m²
- Installation Duration: 11 days
- Materials Used: Tarmac Tru Screed BB, quick-drying, C30 floor screed
Undertaking due diligence beforehand we worked closely with the customer to organise pumping the floor screeds from a designated screed area on the adjacent street.
Following installation of the insulations floor screeding commenced following an extensive laser site survey and comprehensive pre-start site visit ensuring that every detail of the floor screeding specification was meticulously planned and pre-approved by our client. Given the constraints and location of the Aparthotel.
The project resented unique logistical challenges, however our team was able to overcome all access restrictions ultimately providing an efficient, high-quality floor screeding installation.
Project Highlights
The installation of 900m² of Tarmac Tru Screed in Bulk Bags, ready mixed, sand and cement floor screed providing material screed mix consistency throughout meeting the client’s high specification standards. We used Tarmac Tru Screed, a premium quick-drying C30 floor screed, delivered daily using timed deliveries and 1-tonne bulk bags to facilitate a smooth and continuous application. Despite the logistical constraints of working at 105-111 Micklegate our team successfully completed the installation within an eleven-day timeline.