Client: Redmoor Academy School Building, Hinckley, Leicestershire
355m2 of floor screeding completed into an academy school building in Hinckley, Leicestershire. Interior Screed Group installed Cemex ES Fibre Reinforced floor screed throughout. A returning customer we were approached by our client to install the membranes, insulations and floor screeds.
Scope of Work
- Client: Redmoor Academy, Hinckley, Leicestershire
- Floor Area: 355m²
- Installation Duration: 5 days
Materials Used: Cemex ES Screed, quick-drying, C30 floor screed
Following several successful installations on behalf of our team was once again contacted by a returning customer to provide our specialised floor screeding services.
On this occasion our task was to install 1200g DPM, 100mm PIR insulation, 500g separating layer, 25mm external edge strip and 8mm internal perimeter strip into the new school facility. Floor screeding commenced following a thorough laser site survey and comprehensive site survey ensuring that every detail of the floor screeding installation was meticulously planned and pre-approved beforehand.
Project Highlights
The installation of 355m² of Cemex ES Screed, ready mixed, sand and cement floor screed providing material screed mix consistency throughout meeting the client’s high specification standards. We used CEMEX ES Screed, a premium quick-drying C30 floor screed, delivered in daily loads to site.